Call a place “new” and doors open: better lending terms, fresh warranties, cleaner compliance. Call it new when it isn’t, and those doors slam shut. The hitch? Different agencies and banks in New Zealand use slightly different tests for what counts as a new build. Here’s the plain-English version of what qualifies in 2025, how to prove it, and where it makes (and doesn’t make) a financial difference.

  • TL;DR: In NZ, a new build is a self‑contained dwelling that has never been lived in and has a Code Compliance Certificate (CCC) for that dwelling/site. Conversions from non‑residential to residential also qualify.
  • Proof lives in paperwork: CCC, council records, title/subdivision docs, and (often) a vendor’s statutory declaration of no prior occupancy.
  • Banks often treat genuine new builds more generously under LVR rules; tax settings in 2025 matter less than they used to, but old contracts can still rely on “new build” definitions.
  • Relocated older homes and heavy renovations usually don’t qualify, even if the place “feels” brand new.
  • Get the documents and dates right before you sign; you can’t retrofit “new build” status later.

What counts as a new build in New Zealand (2025)?

Short answer: a self‑contained home that has never been occupied and has a Code Compliance Certificate issued for that dwelling on that site. Think of it as two tests-legal completion and first occupancy. If it passes both, you’re in new build territory.

Legal completion in NZ is tied to the Building Act 2004 and your local council (Auckland Council where I live). A CCC confirms the council is satisfied the building work complies with the consent and the Building Code. For a home to be a new build home, you want a CCC that matches the dwelling you’re buying-same address, same legal lot/flat plan, same scope of work described in the consent.

Here are the most common scenarios that do qualify:

  • Off‑the‑plan or brand‑new spec homes. Never occupied, CCC recently issued for the specific house or unit you’re buying.
  • New apartments and townhouses. The unit is part of a newly constructed building with a CCC (or staged CCCs) covering habitable units.
  • Conversions from non‑residential to residential. An office or warehouse converted into apartments and consented as dwellings counts as “new” because it adds residential supply and has a new CCC for that use.
  • Additional new dwelling on an existing site. A new minor dwelling/granny flat or a second townhouse in the backyard-if it’s self‑contained (kitchen, bathroom, sleeping), consented as a dwelling, and has its own CCC, it’s new.
  • Demolish-and-rebuild on the same site. The old house is gone; the new one has its own CCC. Treated as a new home for most practical purposes.

Edge cases to watch:

  • Relocated older homes. Moving a 1920s villa onto new piles does not magically turn it into a new build. It’s an existing dwelling in a new place. Unless the home itself is newly constructed and first sited with a CCC as a dwelling, it won’t qualify.
  • Substantial renovations. New kitchen, new wiring, even new cladding-still not a new build if the original dwelling remains. The line only shifts if the work is effectively a new dwelling with a fresh CCC for that dwelling (rare and clearly documented).
  • “Never lived in” but old CCC. Maybe a developer held a finished house vacant for two years. It’s “unused,” but some bank and policy definitions lean on CCC date windows as well as occupancy. You might lose certain lending advantages if that window has expired.
  • Tiny homes and modular builds. If consented and issued a CCC as a dwelling on that site and never occupied, they can qualify. If it’s a vehicle or building on temporary wheels without dwelling consent, it won’t.

How do you prove it? Paper trails win. Ask for:

  • Code Compliance Certificate (CCC): Confirm issue date, site/legal description, and that the work description aligns with a new dwelling, not just alterations.
  • Council consent pack: Building consent number, inspection records, and any staged CCCs for multi‑unit projects.
  • Record of Title: Check new subdivisions (s 224(c) certificate) and that your legal lot matches the CCC.
  • Statutory declaration of no prior occupancy: A signed, witnessed statement from the vendor/developer put this beyond doubt.
  • Sales history and utilities: Zero tenancy bonds lodged; no prior power/gas accounts can help corroborate “never occupied.”

Two quick sanity checks:

  • If the listing mentions a “practical completion certificate,” that’s not the same as a CCC. Banks and councils care about the CCC.
  • If a home was “staged” or used as a display suite, it can still be new if it was never lived in. Get that in writing.
Why ‘new build’ status matters: money, rules, and risk

Why ‘new build’ status matters: money, rules, and risk

Why should you care if a place ticks the new build box? Because it changes your lending options, risk profile, and the paperwork you’ll live with for years.

1) Lending (LVR) advantages

Reserve Bank loan-to-value ratio (LVR) settings apply at the bank-portfolio level, and banks decide how to allocate their allowances. In practice, genuine new builds are often treated more flexibly-especially for investors-because they add to housing supply. The usual investor cap in 2025 is tighter than for owner‑occupiers (banks commonly cap many investor loans at around 70% LVR), but new builds can be exempt or get softer treatment. Rules vary by bank and can change, so ask your lender: “Will you treat this as a new build for LVR?” Provide the CCC and a no‑occupancy declaration early to avoid surprises.

2) Tax (less crucial than it used to be)

Two big changes flattened the playing field in 2024-2025. First, the bright‑line test returned to two years from 1 July 2024-so the special “new build” bright‑line period that used to exist is effectively moot for new purchases. Second, interest deductibility on residential rentals is being fully restored (100% from 1 April 2025), so the old carve‑outs that privileged new builds are no longer the main game. That said, older sale-and-purchase contracts signed under the previous settings sometimes rely on “new build” definitions from Inland Revenue (IRD), which tied new build status to a self‑contained residence with a CCC issued on or after specific dates. If you’re dealing with historic rules, run the docs by your accountant.

3) Warranties and defect rights

The Building Act 2004 builds in some consumer protection for residential building work:

  • 12‑month defects repair period: The builder must fix notified defects within this window after completion.
  • Implied warranties up to 10 years: Covering things like proper workmanship and compliance with plans/consents.
  • Written contract and disclosure requirements: If the building work exceeded the legal threshold (it often does), there should be a written contract and pre‑contract disclosures.

Many developers also offer third‑party guarantees, like a 10‑year Master Build Guarantee (Registered Master Builders) or Halo (NZCB). These can cover structural defects and sometimes loss of deposit if a builder goes under-read the scope, exclusions, and assignment process carefully.

4) Renting and Healthy Homes

New doesn’t automatically mean compliant with the Healthy Homes Standards. Yes, modern builds tend to exceed thermal settings (especially after the H1 energy efficiency updates), but landlords still need compliant heating, ventilation, moisture control, draught stopping, and insulation. If you’re buying a new place to rent, ask the developer for a Healthy Homes assessment template or evidential specs (insulation R‑values, extractor fan flow rates, heating capacity calculations). You’ll thank yourself later when you go to lodge a tenancy.

5) Insurance and body corporate reality

Insurers love documentation. A clean CCC file and producer statements make underwriting smoother. For apartments/townhouses, check the body corporate’s long‑term maintenance plan and defect process. Most new complexes go through a 12‑month defects round. You want minutes that show issues are being logged and remedied-not ignored.

6) GST, clauses, and price risk

Developers typically sell dwellings GST‑inclusive. If you’re not GST‑registered (most home buyers aren’t), you can’t claim it back. Buying off‑the‑plan? Scrutinise the sunset clause (who benefits if titles are delayed?), escalation clauses for materials costs, and the specifications schedule. A new build should be clear on fixtures, brands, and performance-not vague “or similar” promises that invite disappointment.

Who What they care about Typical proof Why it matters in 2025
Local Council (e.g., Auckland Council) Building Code compliance and lawful use as a dwelling CCC, consent file, inspection records Legal sign‑off that the home is complete and habitable
Banks / Lenders LVR treatment, first occupancy, construction risk CCC, no‑occupancy declaration, sale & purchase agreement New builds often get more flexible LVR treatment, especially for investors
Inland Revenue (IRD) Historic “new build” definitions for prior tax rules CCC date, dwelling status, build timeline Less critical for new purchases, but matters for older contracts/accounting
Tenancy Services / Healthy Homes Heating, insulation, ventilation, moisture, draughts Product specs, compliance statements, assessment reports Landlords need to prove compliance from the first tenancy
Body Corporate (Unit Titles) Defects liability, maintenance, building warranties Minutes, LTMP, warranty/guarantee assignments Protects your future levies and repair exposure
Insurers Build quality, compliance, materials CCC, producer statements, specifications Smoother underwriting, fewer surprises on claims
How to confirm a property is a new build (and buy smart)

How to confirm a property is a new build (and buy smart)

Here’s the process I wish every buyer followed before calling a place “new.” It’s quick, saves arguments, and gives your bank and lawyer exactly what they need.

  1. Start with the CCC. Confirm the address, legal description, issue date, and that the work is a new dwelling (not alterations). For multi‑unit builds, check whether CCCs are staged. Ask the council for the consent file if anything doesn’t line up.
  2. Match the legal titles. In subdivisions, check the Record of Title and that council’s section 224(c) certificate has issued. The lot/flat plan on the title should match what’s on the CCC and your agreement.
  3. Prove “never occupied.” Get a statutory declaration from the developer/vendor. Cross‑check for tenancy bonds, electricity account history, and listing/sales history.
  4. Check the spec and compliance pack. You want appliance brands/models, insulation R‑values, window specs (e.g., Low‑E, thermally broken frames), ventilation fan capacities, wet‑area membranes, and producer statements (PS1/PS3/PS4 where applicable).
  5. Talk to your bank early. Ask: “Will you treat this as a new build for LVR and construction risk?” Send the CCC and stat dec. If it’s off‑the‑plan, ask what they need at each drawdown stage.
  6. Guarantees and assignments. Nail down the transfer of any Master Build/Halo or product warranties (cladding, windows, roof, waterproofing). Clarify who pays the assignment fee and when.
  7. Body corporate diligence (if applicable). Read minutes, long‑term maintenance plan, and any defect lists. Ensure the developer’s warranties are being registered in the BC’s name.
  8. Healthy Homes ready. If you’re renting it out, line up a Healthy Homes assessment or gather the specs to prove compliance from day one.
  9. Contract safeguards (off‑the‑plan). Review the sunset clause, default interest, price‑escalation terms, and the exact fixtures/finishes list. Lock in key items to avoid “or similar” swaps.

Quick scenarios to make it concrete:

  • New terrace townhouse, CCC issued three months ago, never occupied: New build. Banks usually treat it as such. Keep the CCC and a stat dec on file.
  • Apartment finished 18 months ago, used as a display suite, never lived in: It’s new in the everyday sense, but some lenders may go “meh” on LVR perks due to timing. Ask the bank, don’t assume.
  • Office‑to‑apartment conversion completed this year with a CCC: New build for most purposes. Conversions that create residential dwellings qualify.
  • Relocated villa onto a new site with new piles: Not a new build. It’s an existing dwelling moved to a new address.
  • “Gutted to the studs” reno with shiny finishes: Still not a new build unless there’s a CCC for a new dwelling (very uncommon). Great reno, different category.

Buyer’s checklist you can actually use:

  • CCC for the dwelling/site (dates and descriptions match)
  • Title and subdivision certificates align with CCC
  • No‑occupancy stat dec from the seller/developer
  • Spec list + producer statements (cladding, structure, waterproofing, windows)
  • Guarantee assignment paperwork (Master Build/Halo, product warranties)
  • Healthy Homes evidence (if renting)
  • Bank confirmation of “new build” treatment (email is fine)
  • Clear contract terms on sunset, variations, and inclusions (off‑the‑plan)

Mini‑FAQ:

  • Does a garage conversion count? Only if it’s consented as a self‑contained dwelling (kitchen, bathroom) and gets a CCC for that use. Most garage conversions don’t meet the full dwelling test.
  • Is “practical completion” enough? No. That’s a construction milestone. Lenders and councils look for the CCC.
  • If a developer lived there for a month, is it still new? No. The first occupancy breaks the “new” status for most practical definitions.
  • Are new builds automatically Healthy Homes compliant? Not automatically. Many exceed thermal code, but you still have to prove each standard.
  • Can I claim GST back on a new home? Not if you’re buying as a private homeowner. Different story if you’re GST‑registered and the property is part of a taxable activity-talk to an accountant.
  • Do banks always exempt new builds from investor LVR caps? Not always, but it’s common. Each bank has its settings. Get it in writing.

Next steps, depending on who you are:

  • First‑home buyer: Ask the agent for the CCC, spec sheet, and a no‑occupancy stat dec template. Send these to your broker and lawyer the same day.
  • Investor: Confirm the bank’s new build treatment before you sign. Order a Healthy Homes assessment and a rental appraisal so you know your cashflow day one.
  • Selling a new build: Package the CCC, consent file, warranties, and a signed stat dec in the data room. You’ll attract stronger finance‑approved buyers and cleaner offers.
  • Agent or property manager: Don’t rely on “brand‑new” in ads. Put the CCC date, and whether the property has ever been occupied, in writing.

Credible sources to quote in your contract notes: the Building Act 2004 and MBIE Building Performance for compliance and warranties; your local council (Auckland Council) for CCC/consent records; the Reserve Bank and your chosen lender for LVR treatment; Inland Revenue for legacy “new build” definitions tied to CCC dates; Tenancy Services for Healthy Homes rules; and Master Builders/NZCB for guarantee terms. You don’t need to be a lawyer-just keep the paperwork tidy, and ask every party to state the facts in black and white.

One last thought from the Auckland coalface: the market rewards clarity. If the home is genuinely new, you can prove it within a day with the CCC, title, and a stat dec. If you can’t, assume the bank and your lawyer will treat it as not new-and price, finance, and negotiate with that in mind.