Renovation Budget Calculator

Your Project Details

Budget Estimate

Enter your renovation details to see your budget estimate

Total Estimated Cost: $0
With 12% Contingency: $0
Your renovation budget estimate will appear here
Tips for Staying Within Budget
  • Get 3 quotes for each trade to save 5-10%
  • Shop materials off-season (winter months)
  • Reuse existing fixtures where possible
  • Consider phased projects for high-impact rooms first

When you ask, Home Renovation is the process of improving or modernising an existing house to increase comfort, functionality, or resale value, the first thing most people wonder is whether a six‑figure budget will actually stretch. In 2025, the average price for labour, materials, and permits in Auckland sits around $3,200 per square metre, but that figure can swing wildly depending on the scope of work. This guide breaks down the dollars, shows where $100,000 can get you, and offers practical tricks to make every penny count.

Key Takeaways

  • A $100,000 budget can comfortably cover a moderate‑size kitchen and bathroom remodel, plus a new roof or flooring for a typical 150‑sqm home.
  • Major structural changes (e.g., adding another floor) usually require $150,000 + in Auckland.
  • Labour makes up roughly 40‑45% of total costs; sourcing competitive quotes can save $10,000‑$20,000.
  • Always set aside 10‑15% of the budget for contingencies and unexpected permits.
  • Phasing the project-completing high‑impact rooms first-lets you live in the house while you finish later stages.

What Drives Renovation Costs?

Before you hand over a cheque, understand the four cost pillars that shape any renovation budget:

  1. Scope of work - Adding a new bathroom, moving walls, or extending the footprint adds structural and design complexity.
  2. Location - Auckland’s building consent fees and labour rates are higher than most provincial towns.
  3. Materials & finishes - Choosing premium stone countertops versus laminate can double a kitchen’s price per square metre.
  4. Professional services - Architects, engineers, and project managers each take a percentage of the total spend.

Typical Cost Breakdown for Common Trades

Average 2025 NZ Costs per Square Metre (Auckland)
Trade Low‑End Mid‑Range High‑End
Kitchen remodel $2,500 $3,500 $5,200
Bathroom upgrade $2,200 $3,300 $4,800
Roof replacement $120 $180 $250
Flooring (hardwood) $85 $120 $180
Plumbing & Riser Work $1,800 $2,500 $3,400
Electrical Re‑wiring $1,500 $2,200 $3,000
Three panels illustrating modest, mid‑range, and phased renovation scenarios with cost labels.

Where 0,000 Takes You - Three Real‑World Scenarios

Below are three sample budgets for a 150‑sqm family home in Auckland. All figures include a 12% contingency fund and assume a mid‑range finish unless otherwise noted.

Scenario 1 - Modest Refresh

  • Kitchen remodel: $30,000 (laminate counters, standard cabinets)
  • Bathroom upgrade: $22,000 (ceramic tiles, prefabricated shower)
  • New roof: $12,000
  • Flooring (carpet + low‑grade timber): $9,000
  • Permits & approvals (Auckland Council): $5,000
  • Project management & design: $8,000
  • Contingency (12%): $12,000

Total: $98,000. You end up with a functional, modern kitchen and bathroom, plus a weather‑tight roof.

Scenario 2 - Mid‑Range Upgrade

  • Kitchen remodel (quartz counters, soft‑close cabinets): $45,000
  • Bathroom upgrade (walk‑in shower, heated floors): $30,000
  • Roof replacement (metal roofing): $15,000
  • Flooring (engineered hardwood): $12,000
  • Permits & engineering: $6,000
  • Design & project management: $10,000
  • Contingency (12%): $12,000

Total: $130,000 - exceeds the $100k cap, showing that premium finishes quickly push you beyond.

Scenario 3 - Phased Approach

  • Phase 1 - Kitchen remodel (mid‑range): $38,000
  • Phase 2 - Roof replacement: $15,000 (deferred 6 months)
  • Phase 3 - Bathroom upgrade (budget‑friendly): $18,000
  • Permits (all phases combined): $7,000
  • Project management (phased): $9,000
  • Contingency (12% on each phase): $9,000

Total: $96,000. By spacing work over a year, you stay under $100k while still hitting the most visible rooms.

Tips to Stretch Your $100,000 Renovation Budget

  • Get three quotes for every major trade; the cheapest often isn’t the best, but competition trims costs by 5‑10%.
  • Shop off‑season - suppliers discount tiles and timber in winter months.
  • Reuse existing fixtures where possible; a refurbished bathtub can save $3,000‑$5,000.
  • Do simple demolition yourself (remove cabinets, pull carpet) to cut labour fees.
  • Choose engineered rather than solid hardwood for flooring - looks similar, costs 30% less.
  • Bundle permits - applying for a combined kitchen‑bathroom consent reduces council fees by up to 20%.
  • Set a firm contingency and stick to it; use any surplus for upgrades you truly need.
Homeowner reviewing a renovation checklist with blueprint, tools, and a piggy bank nearby.

Renovation Planning Checklist

  1. Define the exact scope - list rooms, desired finishes, and any structural changes.
  2. Research local permits required by Auckland Council.
  3. Engage a designer or architect for layout plans (optional for minor updates).
  4. Obtain at least three written quotes from licensed contractors.
  5. Calculate total cost, add 12‑15% contingency, and compare to $100,000.
  6. Prioritise high‑impact rooms - kitchen, bathroom, roof.
  7. Schedule work in phases if the total exceeds budget.
  8. Secure financing or set aside savings before contracts are signed.

Common Pitfalls and How to Avoid Them

Even seasoned homeowners run into surprises. Here are the top three and quick fixes:

  • Under‑estimating hidden costs - old plumbing behind walls often needs replacement. Mitigate by having a whistle‑blow inspection before final quotes.
  • Scope creep - mid‑project requests for extra cabinets or luxury finishes can blow the budget. Lock in a change‑order process and price each addition before work begins.
  • Delays due to permit hold‑ups - Auckland Council’s consent process can take 4‑6 weeks. Submit all required documents early and keep a line of communication open.

Frequently Asked Questions

Can I do a whole‑house renovation for $100,000?

For a 150‑sqm home in Auckland, a full gut‑rehab with premium fixtures will likely exceed $150,000. $100,000 can cover a kitchen, bathroom, and roof, but not a complete structural overhaul.

Do I need a designer for a $100k renovation?

A designer isn’t mandatory, but for $100k you’ll get better space planning and fewer costly errors. Expect to spend $5,000‑$10,000 on design services.

How much should I set aside for contingency?

Industry standards in New Zealand recommend 10‑15% of the total budget. With $100,000, allocate $10,000‑$15,000 for unexpected structural or supply issues.

Are there tax benefits for renovating?

If the renovation improves rental income, you may claim depreciation on new assets. For owner‑occupied homes, the renovation cost isn’t tax‑deductible in NZ.

What’s the best time of year to start a renovation?

Winter (May-August) is slower for contractors, so you often secure lower rates and quicker material deliveries.